27 line items · $51M · starting 2026–2028 · 1 plan
Portage's published capital plans list 27 water, sewer and wastewater line items with a combined planning budget of $51M, of which 17 items worth $47M sit in the wastewater and sewer departments. The largest single item is Phosphorous Compliance Plant Upgrade at $40M (2026–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Phosphorous Compliance Plant Upgrade | Wastewater | Nutrient removal | $40M | 2026–2028 |
| 2 | Replace Screw Pumps | Wastewater | Pump stations | $2M | 2027 |
| 3 | C - Replace / Upgrade Ray-O-Vac Lift Station | Sewer | Lift stations | $1M | 2026 |
| 4 | Sanitary Replace TBD | Sewer | Sewer rehabilitation and I&I | $1M | 2025–2028 |
| 5 | Facilities / Phosphorous Compliance Plans Design | Wastewater | Nutrient removal | $1M | 2025 |
| 6 | Water Main Replace STH 33 (Wis River to W Wisc. 2027) #6040-00-76 | Water Distribution | Water mains and distribution | $976K | 2026–2027 |
| 7 | Water Main Replacement Design/Construct (Loc TBD) | Water Distribution | Water mains and distribution | $960K | 2025–2029 |
| 8 | STH 33 Sanitary Replace Design / Construct | Sewer | Sewer rehabilitation and I&I | $666K | 2026–2027 |
| 9 | US 51 Sanitary Replace Design / Construct | Sewer | Sewer rehabilitation and I&I | $491K | 2025 |
| 10 | Repair and Media Replacement Softener Northside | Water Supply | — | $450K | 2027–2029 |
17 more line items in Portage, with descriptions and contacts
Klarifi holds every Portage line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$6M
15 items
2026
$43M
7 items
2027
$2M
4 items
2028
$50K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $43M | 84% |
| Sewer | 10 | $4M | 9% |
| Water Supply | 3 | $1M | 2% |
| Water Distribution | 7 | $3M | 6% |
1 publicly owned treatment plant in Portage with 32 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Portage Wastewater Treatment Facility | 1.52 | WI0020427 | 32 |
Sources and methodology
Budgets and years are as published in Portage’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (27 line items).
Data refreshed September 11, 2026.