Merced, California: water and wastewater capital improvement projects

66 line items · $176M · starting 2026–2029 · 1 plan

Merced's published capital plans list 66 water, sewer and wastewater line items with a combined planning budget of $176M, of which 29 items worth $35M sit in the wastewater and sewer departments. The largest single item is 16 Inch Water Main at $49M (2029–2031). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Merced

The 10 largest water, sewer and wastewater line items in Merced’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
116 Inch Water MainWater DistributionWater mains and distribution$49M2029–2031
2WWTP Phase VI Solids Handling FacilitiesWastewaterBiosolids, sludge and dewatering$20M2027–2028
310 MGD Water Treatment Plant Location TBDWater SupplyWater treatment plants$17M2029–2031
4Surface Water Treatment PlantWater SupplyWater treatment plants$17M2029–2031
5Gerard Sewer Trunk LineSewerForce mains and interceptors$7M2026–2027
618 Inch Water MainWater DistributionWater mains and distribution$7M2029–2031
7Water Storage Tank & Booster Pump Station #2Water SupplyPump stations$4M2026–2031
8Water Storage Tank & Booster Pump Station #3Water SupplyPump stations$4M2026–2031
9Water Main Replacement - Canal - Well #3 to 27/28 AlleyWater DistributionWater mains and distribution$3M2029–2031
10Water Well # 23 Location TBDWater SupplyWells and groundwater$3M2026–2027

56 more line items in Merced, with descriptions and contacts

Klarifi holds every Merced line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$9M

15 items

2026

$25M

8 items

2027

$23M

14 items

2028

$4M

3 items

2029

$116M

26 items

By department

Line items and planning budgets by department, Merced.
DepartmentLine itemsBudgetShare
Wastewater13$25M14%
Sewer16$10M6%
Water Supply9$55M31%
Water Distribution28$86M49%

Project types in Merced's plan

Wastewater treatment plants in Merced

1 publicly owned treatment plant in Merced with 5 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Merced WWTF1.87CA00792195

Other California cities with capital plans

Merced capital plan questions

Sources and methodology

Budgets and years are as published in Merced’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2025 (66 line items).

Data refreshed September 11, 2026.