31 line items · $6M · starting 2029 · 1 plan
San Francisco's published capital plans list 31 water, sewer and wastewater line items with a combined planning budget of $6M, of which 4 items worth $1M sit in the wastewater and sewer departments. The largest single item is Treatment Facilities at $1M (2025–2033). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Treatment Facilities | Water Supply | — | $1M | 2025–2033 |
| 2 | Stormwater Management/Flood Control | Water Supply | Stormwater and flood resilience | $662K | 2025–2033 |
| 3 | Local Water Conveyance/Distribution System | Water Supply | Water mains and distribution | $563K | 2025–2033 |
| 4 | Collection System - Large Diameter Sewer | Sewer | Sewer rehabilitation and I&I | $469K | 2025–2033 |
| 5 | Collection System - Sewer Improvements | Sewer | Sewer rehabilitation and I&I | $450K | 2025–2033 |
| 6 | Buildings & Grounds Improvements - Local | Water Supply | Buildings, HVAC and site work | $347K | 2025–2033 |
| 7 | Water Transmission Program | Water Supply | Water mains and distribution | $327K | 2025–2033 |
| 8 | Treatment Plant Improvements | Water Supply | Wastewater treatment plant upgrades | $299K | 2025–2033 |
| 9 | Buildings And Grounds Programs | Water Supply | Buildings, HVAC and site work | $240K | 2025–2033 |
| 10 | Sewer/Collection System | Sewer | Sewer rehabilitation and I&I | $196K | 2025–2033 |
21 more line items in San Francisco, with descriptions and contacts
Klarifi holds every San Francisco line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$6M
30 items
2029
$0K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 4 | $1M | 22% |
| Water Supply | 27 | $5M | 78% |
2 publicly owned treatment plants in San Francisco with 13 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Ccsf- Southeast Water Pollution Control Plant | 45.87 | CA0037664 | 13 |
| Sfia, Mel Leong Sanitary And Industrial Treatment Plants | — | CA0038318 | 0 |
Sources and methodology
Budgets and years are as published in San Francisco’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2033 (31 line items).
Data refreshed September 11, 2026.