Klarifi Logo
Try for freeLog in
Klarifi Logo

Cocoa, Florida: water and wastewater capital improvement projects

89 line items · $127M · starting 2026–2028 · 1 plan

Cocoa's published capital plans list 89 water, sewer and wastewater line items with a combined planning budget of $127M, of which 40 items worth $23M sit in the wastewater and sewer departments. The largest single item is New WS09 48-inch Pipeline West of Well 7A to Dallas (Little Econ to Wewahootee) at $28M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Cocoa

The 10 largest water, sewer and wastewater line items in Cocoa’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1New WS09 48-inch Pipeline West of Well 7A to Dallas (Little Econ to Wewahootee)Water DistributionWater mains and distribution$28M2025–2026
2New Pineda Crossing 16" Water Main - Phase IIWater DistributionWater mains and distribution$14M2024–2027
3Replacement & assessment of pipe infrastructureWater DistributionPlanning, studies and asset management$10M2022–2029
4New WS11 Redundant Pipeline Well 20 to 23Water DistributionWater mains and distribution$6M2025–2027
5Replacement of 14"/18" AC raw water pipeline upgrade and Well 17 area isolation valves - Phase IWater DistributionWater mains and distribution$5M2024–2026
6New Redundant Pipeline Well 11 to 42Water DistributionWater mains and distribution$5M2025–2027
7Replacement of WT63 of Dyal Finished Water Steel GSTWater SupplyStorage tanks and reservoirs$5M2023–2026
8Surface Water Treatment Plant Chemical Facility Upgrades (FKA New Cal-Flo Tank)Water SupplyWater treatment plants$4M2022–2026
9Rehabilitation of Well IT, 4T, 8T, 17T and 18TWater SupplyWells and groundwater$4M2026–2028
10Camp Road/US 1 Forcemain ReplacementWater DistributionForce mains and interceptors$4M2024–2026

79 more line items in Cocoa, with descriptions and contacts

Klarifi holds every Cocoa line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$111M

53 items

2026

$8M

9 items

2027

$3M

11 items

2028

$5M

16 items

By department

Line items and planning budgets by department, Cocoa.
DepartmentLine itemsBudgetShare
Wastewater27$14M11%
Sewer13$9M7%
Water Supply34$23M18%
Water Distribution15$81M64%

Project types in Cocoa's plan

Wastewater treatment plants in Cocoa

1 publicly owned treatment plant in Cocoa with 1 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Cocoa/jerry Sellers (dw)FL00215211

Other Florida cities with capital plans

Cocoa capital plan questions

Sources and methodology

Budgets and years are as published in Cocoa’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (89 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free