19 line items · $171M · 1 plan
Delray Beach's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $171M. The largest single item is Membrane Softening Plant at $113M (2024–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Membrane Softening Plant | Water Supply | Membranes and filtration | $113M | 2024–2027 |
| 2 | Variable Frequency Drives (VFD) for South & North Pump Station | Water Supply | Pump stations | $11M | 2024–2027 |
| 3 | Tropic Isle Neighborhood Improvements | Water Supply | — | $9M | 2024–2027 |
| 4 | Forcemain 50 to SCRWWTP Replacement | Water Distribution | Force mains and interceptors | $8M | 2024–2026 |
| 5 | New Wells | Water Supply | Wells and groundwater | $6M | 2024–2026 |
| 6 | Pump Station #50 Upgrade | Water Supply | Pump stations | $6M | 2024–2026 |
| 7 | Water Meter Replacements | Water Supply | Meters and AMI | $5M | 2024–2025 |
| 8 | Upgrade to Telemetry System (SCADA) | Water Supply | SCADA, controls and instrumentation | $4M | 2024–2026 |
| 9 | Water Treatment Plant Improvements | Water Supply | Wastewater treatment plant upgrades | $3M | 2024–2026 |
| 10 | Reclaimed Water Area 5 & Connecting Services in Area 10 & 14 | Water Supply | Water reuse and reclaimed water | $2M | 2024–2026 |
9 more line items in Delray Beach, with descriptions and contacts
Klarifi holds every Delray Beach line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$171M
19 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Water Supply | 18 | $163M | 95% |
| Water Distribution | 1 | $8M | 5% |
No publicly owned treatment plant is recorded under Delray Beach in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Florida.
Sources and methodology
Budgets and years are as published in Delray Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (19 line items).