Montague, Massachusetts: water and wastewater capital improvement projects

22 line items · $16M · starting 2026–2031 · 1 plan

Montague's published capital plans list 22 water, sewer and wastewater line items with a combined planning budget of $16M, of which 22 items worth $16M sit in the wastewater and sewer departments. The largest single item is CSO LTCP – Phase 2 Sewer Collections Rehab at $3M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Montague

The 10 largest water, sewer and wastewater line items in Montague’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1CSO LTCP – Phase 2 Sewer Collections RehabSewerSewer rehabilitation and I&I$3M2026
2Pump Stations Forced Main ReconstructionSewerPump stations$3M2028
3Reline Off-Road Sewer LinesSewerSewer rehabilitation and I&I$2M2029
4CSO LTCP – Plant Influent Line ReconstructionSewerStormwater and flood resilience$2M2030
5Pump Station Upgrade: J St, G St, Lake Pleasant, Denton StSewerPump stations$1M2028–2029
6Grit Removal and Channel Relocation ProjectWastewaterHeadworks, screening and grit$1M2031
7Composting FacilityWastewaterBiosolids, sludge and dewatering$1M2029
8Secondary Clarifiers Mechanical UpgradeWastewaterClarifiers and settling$600K2027
9UV Disinfection/Chlorine ReplacementWastewaterDisinfection and UV$500K2028
10Lake Pleasant Grinder Pump ConversionSewerPump stations$480K2030

12 more line items in Montague, with descriptions and contacts

Klarifi holds every Montague line item with its description, the page it appears on and the source document, plus 6 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$3M

4 items

2027

$840K

4 items

2028

$5M

6 items

2029

$3M

3 items

2030

$2M

4 items

2031

$1M

1 items

By department

Line items and planning budgets by department, Montague.
DepartmentLine itemsBudgetShare
Wastewater15$4M26%
Sewer7$12M74%

Project types in Montague's plan

Wastewater treatment plants in Montague

1 publicly owned treatment plant in Montague with 237 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Montague Wastewater Treatment Facility0.54MA0100137237

Other Massachusetts cities with capital plans

Montague capital plan questions

Sources and methodology

Budgets and years are as published in Montague’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2031 (22 line items).

Data refreshed September 11, 2026.

Try Klarifi for free