Westborough, Massachusetts: water and wastewater capital improvement projects

12 line items · $19M · starting 2026–2028 · 1 plan

Westborough's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $19M, of which 5 items worth $13M sit in the wastewater and sewer departments. The largest single item is Sewer Pump Station Improvements at $8M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Westborough

The 10 largest water, sewer and wastewater line items in Westborough’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sewer Pump Station ImprovementsSewerPump stations$8M2026–2030
2Sewer Line AnalysisSewerSewer rehabilitation and I&I$3M2026–2028
3Water Main ReplacementWater DistributionWater mains and distribution$3M2027–2030
4Well and Booster Station ImprovementsSewerPump stations$2M2026–2030
5Water Tower MaintenanceWater SupplyStorage tanks and reservoirs$1M2027–2029
6Water Meter System ReplacementWater DistributionMeters and AMI$1M2026–2030
7Sewer Capital ImprovementsSewerSewer rehabilitation and I&I$575K2026–2030
8Lead Service Line MitigationWater DistributionLead service line replacement$400K2026
9Sandra Pond Dam RepairsWater SupplyStorage tanks and reservoirs$385K2028
10Water System Capital MaintenanceWater SupplyWater mains and distribution$225K2026–2028

2 more line items in Westborough, with descriptions and contacts

Klarifi holds every Westborough line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$15M

8 items

2027

$4M

3 items

2028

$385K

1 items

By department

Line items and planning budgets by department, Westborough.
DepartmentLine itemsBudgetShare
Sewer5$13M68%
Water Supply4$2M10%
Water Distribution3$4M22%

Wastewater treatment plants in Westborough

1 publicly owned treatment plant in Westborough with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Westborough Wastewater Treatment Plant4.17MA01004122

Other Massachusetts cities with capital plans

Westborough capital plan questions

Sources and methodology

Budgets and years are as published in Westborough’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (12 line items).