16 line items · $22M · starting 2026–2029 · 1 plan
North Andover's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $22M, of which 5 items worth $4M sit in the wastewater and sewer departments. The largest single item is Improvements to Water Treatment Plant at $6M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Improvements to Water Treatment Plant | Water Supply | Water treatment plants | $6M | 2026–2030 |
| 2 | Water Billing Software/Meter Upgrades & Replacement | Water Supply | Meters and AMI | $5M | 2027–2030 |
| 3 | Sewer Pump Station Improvements | Sewer | Pump stations | $2M | 2026–2030 |
| 4 | Improvements to Various Water Booster Stations/Water | Water Supply | Pump stations | $2M | 2026 |
| 5 | Water Main Replacement | Water Distribution | Water mains and distribution | $2M | 2027–2030 |
| 6 | Sewer Collection System Improvements | Sewer | Sewer rehabilitation and I&I | $2M | 2026–2030 |
| 7 | Lead Service Line Replacement | Water Distribution | Lead service line replacement | $2M | 2026–2030 |
| 8 | Demolition of 400 Great Pond | Water Supply | — | $1M | 2026 |
| 9 | Distribution System Improvements and Upgrades | Water Supply | Water mains and distribution | $850K | 2026–2030 |
| 10 | Ten Wheel Dump Truck | Sewer | Vehicles and equipment | $400K | 2026 |
6 more line items in North Andover, with descriptions and contacts
Klarifi holds every North Andover line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$16M
13 items
2027
$6M
2 items
2029
$150K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 5 | $4M | 19% |
| Water Supply | 9 | $15M | 66% |
| Water Distribution | 2 | $3M | 15% |
1 publicly owned treatment plant in North Andover with 10 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Greater Lawrence Wastewater Treatment Facility | 21.7 | MAL100447 | 10 |
Sources and methodology
Budgets and years are as published in North Andover’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (16 line items).