26 line items · $58M · starting 2026–2030 · 1 plan
Newburyport's published capital plans list 26 water, sewer and wastewater line items with a combined planning budget of $58M, of which 11 items worth $17M sit in the wastewater and sewer departments. The largest single item is Indian Hill Raw Water Line (Phase 2) at $18M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Indian Hill Raw Water Line (Phase 2) | Water Distribution | Water mains and distribution | $18M | 2026–2030 |
| 2 | Lower Artichoke Reservoir Dam Improvement 3 | Water Supply | Storage tanks and reservoirs | $10M | 2026–2030 |
| 3 | Clarifier Upgrades | Wastewater | Clarifiers and settling | $7M | 2026–2029 |
| 4 | Water Meter Replacement Program | Water Distribution | Meters and AMI | $6M | 2026–2027 |
| 5 | Critical Resilient Infrastructure Project | Wastewater | Stormwater and flood resilience | $5M | 2026–2030 |
| 6 | Indian Hill Raw Water Line (Phase 1) | Water Distribution | Water mains and distribution | $3M | 2028–2030 |
| 7 | Sludge Handling Process Improvement | Wastewater | Biosolids, sludge and dewatering | $2M | 2026–2030 |
| 8 | Indian Hill / Storey Avenue Pump Station Upgrades | Water Supply | Pump stations | $2M | 2026 |
| 9 | Storey Avenue Lift Station Replacement | Sewer | Lift stations | $2M | 2026–2030 |
| 10 | Water Treatment Plant PFAS & Facility Improvements | Water Supply | PFAS treatment | $2M | 2029–2030 |
16 more line items in Newburyport, with descriptions and contacts
Klarifi holds every Newburyport line item with its description, the page it appears on and the source document, plus 42 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$52M
13 items
2027
$43K
1 items
2028
$3M
4 items
2029
$2M
4 items
2030
$397K
4 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 9 | $15M | 26% |
| Sewer | 2 | $2M | 3% |
| Water Supply | 5 | $14M | 24% |
| Water Distribution | 10 | $27M | 47% |
1 publicly owned treatment plant in Newburyport. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Newburyport Wastewater Treatment Facility | 1.45 | MAG590035 | 0 |
Sources and methodology
Budgets and years are as published in Newburyport’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (26 line items).
Data refreshed September 11, 2026.