15 line items · $20M · starting 2026–2030 · 1 plan
Webster's published capital plans list 15 water, sewer and wastewater line items with a combined planning budget of $20M, of which 7 items worth $12M sit in the wastewater and sewer departments. The largest single item is Waste Water Treatment Plant Biosolids Construction $3M to $6M at $6M (2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Waste Water Treatment Plant Biosolids Construction $3M to $6M | Wastewater | Biosolids, sludge and dewatering | $6M | 2026 |
| 2 | Waste Water Treatment Plant Aeration System Phase 2 Construction | Wastewater | Aeration and blowers | $5M | 2026 |
| 3 | Water Main Construction (Worcester Rd & Old Worcester Rd) | Water Distribution | Water mains and distribution | $3M | 2028 |
| 4 | Water Main Construction (School Street) | Water Distribution | Water mains and distribution | $2M | 2029 |
| 5 | Water Main Construction (Park Ave) | Water Distribution | Water mains and distribution | $2M | 2030 |
| 6 | WWTP Chemical Building | Wastewater | Wastewater treatment plant upgrades | $850K | 2028 |
| 7 | Annual Well Rehabilitation Stations 1, 2 & 3 | Water Supply | Wells and groundwater | $400K | 2026–2030 |
| 8 | Replace Greensand Plus Media at Memorial Beach WTP | Water Supply | Water treatment plants | $250K | 2029 |
| 9 | Water Main Design (Worcester Rd & Old Worcester Rd) | Water Distribution | Water mains and distribution | $250K | 2026 |
| 10 | Water Main Design (School Street) | Water Distribution | Water mains and distribution | $150K | 2028 |
5 more line items in Webster, with descriptions and contacts
Klarifi holds every Webster line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$12M
8 items
2028
$4M
3 items
2029
$3M
3 items
2030
$2M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $12M | 60% |
| Water Supply | 2 | $650K | 3% |
| Water Distribution | 6 | $8M | 37% |
No publicly owned treatment plant is recorded under Webster in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Massachusetts.
Sources and methodology
Budgets and years are as published in Webster’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (15 line items).
Data refreshed September 11, 2026.