Log inTry for free

Uxbridge, Massachusetts: water and wastewater capital improvement projects

Water, sewer and wastewater line items in Uxbridge’s published capital improvement plans and adopted budgets, with budgets, years and the source documents.

Planned budget
$19M
Line items
5
Wastewater and sewer
$2M
2 line items
Starting
2026
Plan
1

Uxbridge's published capital plans list 5 water, sewer and wastewater line items with a combined planning budget of $19M, of which 2 items worth $2M sit in the wastewater and sewer departments. The largest single item is Distribution System Rehabilitation Program at $15M (2024–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Uxbridge

The 5 largest water, sewer and wastewater line items in Uxbridge’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Distribution System Rehabilitation ProgramWater DistributionWater mains and distribution$15M2024–2028
2Source Rehabilitation ProgramWater Supply—$2M2024–2028
3Inflow/Infiltration ProgramSewerMembranes and filtration$2M2024–2028
4Vehicle & Equipment Replacement ProgramWater SupplyVehicles and equipment$350K2024–2028
5Vehicle & Equipment Replacement ProgramWastewaterVehicles and equipment$155K2026–2028
Descriptions, page references and contacts for Uxbridge
Klarifi holds every Uxbridge line item with its description, the page it appears on and the source document, plus 10 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Create a free account

Planned spend by start year

Before 2026
$19M
4 items
2026
$155K
1 items

By department

Line items and planning budgets by department, Uxbridge.
DepartmentLine itemsBudgetShare
Wastewater1$155K1%
Sewer1$2M8%
Water Supply2$2M12%
Water Distribution1$15M79%

Project types in Uxbridge's plan

  • Water mains and distribution
    1 line items
    $15M
  • $2M

Wastewater treatment plants in Uxbridge

1 publicly owned treatment plant in Uxbridge with 24 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Uxbridge Wastewater Treatment Facility0.91MAG59000324

Other Massachusetts cities with capital plans

All Massachusetts plans

Uxbridge capital plan questions

  1. How much is Uxbridge, MA planning to spend on water and sewer infrastructure?

    Uxbridge’s published capital plans list 5 water, sewer and wastewater line items with a combined budget of $19M, of which $2M is in the wastewater and sewer departments.

  2. What is the largest capital project in Uxbridge’s plan?

    Distribution System Rehabilitation Program, budgeted at $15M and scheduled for 2024–2028 under the Water Distribution department.

  3. When do Uxbridge’s water and sewer projects start?

    1 projects ($155K) start in 2026. Budgets are as published in the plan and can change at adoption.

  4. How do I find the contacts and full project list for Uxbridge?

    Klarifi holds every line item with its description, page reference and source document, plus 10 verified contacts at the city’s treatment plants. The public page shows the ten largest items; the full list is available with a free trial.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for freeOr book a demo
Wastewater market intelligence: facilities, permits, compliance and capital projects for North America and Europe.
© 2026 Klarifi ApS, Diplomvej 381, 2800 Kgs. Lyngby, Denmark
Public data refreshed Nov 2, 2026