Palmer (Three Rivers), Massachusetts: water and wastewater capital improvement projects

19 line items · $36M · starting 2026–2030 · 1 plan

Palmer (Three Rivers)'s published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $36M, of which 19 items worth $36M sit in the wastewater and sewer departments. The largest single item is Sewer Rehab - Phase 1 at $5M (2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Palmer (Three Rivers)

The 10 largest water, sewer and wastewater line items in Palmer (Three Rivers)’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Sewer Rehab - Phase 1SewerSewer rehabilitation and I&I$5M2029
2Thorndike Street Sewer SiphonSewerSewer rehabilitation and I&I$5M2027
3Pump Station #2 Upgrade (category B & C)SewerPump stations$5M2030
4Pump Station Upgrade (Category A)SewerPump stations$4M2028
5WPCF Upgrades (phase 1 &2)WastewaterWastewater treatment plant upgrades$3M2030
6ThickenersWastewaterBiosolids, sludge and dewatering$3M2027
7UV ProjectWastewaterDisinfection and UV$3M2026
8Screw Pump ReplacementWastewaterPump stations$2M2029
9Sludge Dewatering CentrifugeWastewaterBiosolids, sludge and dewatering$2M2026
10Influent Structure Rehab (3Rivers Siphon)WastewaterHeadworks, screening and grit$2M2027

9 more line items in Palmer (Three Rivers), with descriptions and contacts

Klarifi holds every Palmer (Three Rivers) line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$6M

4 items

2027

$9M

4 items

2028

$5M

5 items

2029

$8M

3 items

2030

$8M

3 items

By department

Line items and planning budgets by department, Palmer (Three Rivers).
DepartmentLine itemsBudgetShare
Wastewater11$16M44%
Sewer8$20M56%

Wastewater treatment plants in Palmer (Three Rivers)

1 publicly owned treatment plant in Palmer (Three Rivers) with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Palmer Water Pollution Control Facility1.2MA01011684

Other Massachusetts cities with capital plans

Palmer (Three Rivers) capital plan questions

Sources and methodology

Budgets and years are as published in Palmer (Three Rivers)’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (19 line items).

Data refreshed September 11, 2026.