Rockland, Massachusetts: water and wastewater capital improvement projects

17 line items · $78M · starting 2026–2028 · 1 plan

Rockland's published capital plans list 17 water, sewer and wastewater line items with a combined planning budget of $78M, of which 8 items worth $74M sit in the wastewater and sewer departments. The largest single item is Design replace the influent System including tanks etc. at $40M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Rockland

The 10 largest water, sewer and wastewater line items in Rockland’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Design replace the influent System including tanks etc.WastewaterStorage tanks and reservoirs$40M2028
2Sewer Plant Capital ImprovementsSewerSewer rehabilitation and I&I$33M2025–2027
3Water TanksWater SupplyStorage tanks and reservoirs$3M2026
4Annual Control Plan for I&ISewerSewer rehabilitation and I&I$655K2025–2029
5Water Meter ReplacementsWater DistributionMeters and AMI$350K2025–2029
62 Additional Ejector StationsWastewater$200K2026
7Filter pump upgradesWater SupplyMembranes and filtration$200K2025–2028
8Water Plant infrastructure Upgrades All 3 PlantsWater SupplyWater treatment plants$200K2025–2026
9Gate Valve ProgramWater DistributionWater mains and distribution$150K2025–2029
10Hydrant ReplacementsWater DistributionWater mains and distribution$150K2025–2029

7 more line items in Rockland, with descriptions and contacts

Klarifi holds every Rockland line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$35M

13 items

2026

$3M

3 items

2028

$40M

1 items

By department

Line items and planning budgets by department, Rockland.
DepartmentLine itemsBudgetShare
Wastewater5$40M52%
Sewer3$33M43%
Water Supply3$3M4%
Water Distribution6$958K1%

Project types in Rockland's plan

Wastewater treatment plants in Rockland

1 publicly owned treatment plant in Rockland with 32 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Rockland Wastewater Plant2MAG59003832

Other Massachusetts cities with capital plans

Rockland capital plan questions

Sources and methodology

Budgets and years are as published in Rockland’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2029 (17 line items).

Data refreshed September 11, 2026.