16 line items · $34M · starting 2026–2028 · 1 plan
Northampton's published capital plans list 16 water, sewer and wastewater line items with a combined planning budget of $34M, of which 6 items worth $8M sit in the wastewater and sewer departments. The largest single item is Reservoir Construction at $9M (2028–2029). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Reservoir Construction | Water Supply | Storage tanks and reservoirs | $9M | 2028–2029 |
| 2 | Transmission Main Rehabilitation | Water Distribution | Water mains and distribution | $7M | 2027 |
| 3 | Waterline Replacement | Water Supply | Water mains and distribution | $5M | 2026–2030 |
| 4 | Sewer Line Replacement | Sewer | Sewer rehabilitation and I&I | $4M | 2026–2030 |
| 5 | Main Street Corridor Utility Infrastructure | Water Distribution | Water mains and distribution | $3M | 2026 |
| 6 | WWTP & Pump Station Improvements | Sewer | Pump stations | $2M | 2028–2030 |
| 7 | Vehicle Replacement | Water Supply | Vehicles and equipment | $915K | 2026–2029 |
| 8 | Vehicle Replacement | Sewer | Vehicles and equipment | $820K | 2026–2030 |
| 9 | Granular Activated Carbon | Water Supply | Membranes and filtration | $750K | 2026–2030 |
| 10 | Water Distribution & Treatment Equipment | Water Supply | Water mains and distribution | $500K | 2026–2030 |
6 more line items in Northampton, with descriptions and contacts
Klarifi holds every Northampton line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$16M
13 items
2027
$7M
1 items
2028
$11M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 1 | $150K | 0% |
| Sewer | 5 | $8M | 22% |
| Water Supply | 6 | $16M | 47% |
| Water Distribution | 4 | $10M | 30% |
1 publicly owned treatment plant in Northampton with 40 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Northampton Wastewater Treatment Plant | 3.84 | MA0101818 | 40 |
Sources and methodology
Budgets and years are as published in Northampton’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (16 line items).
Data refreshed September 11, 2026.