27 line items · $14M · starting 2026–2027 · 1 plan
St. Johns's published capital plans list 27 water, sewer and wastewater line items with a combined planning budget of $14M, of which 15 items worth $7M sit in the wastewater and sewer departments. The largest single item is TRLS Force Main Replacement at $4M (2027–2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | TRLS Force Main Replacement | Wastewater | Force mains and interceptors | $4M | 2027–2028 |
| 2 | New Elevated Water Tower – Industrial Park | Water Supply | Storage tanks and reservoirs | $3M | 2026–2027 |
| 3 | Water Main Replacement – M-21 Corridor Throughout City Limits | Water Distribution | Water mains and distribution | $2M | 2026–2029 |
| 4 | Collection System – Pipe Lining and Maintenance | Wastewater | Sewer rehabilitation and I&I | $1M | 2024–2030 |
| 5 | TRLS Service Area Inflow and Infiltration (I&I) Reduction | Wastewater | Membranes and filtration | $1M | 2026–2029 |
| 6 | Water Main Installation – Scott Road (Searles Estates Drive to CIS Trail) | Water Distribution | Water mains and distribution | $450K | 2024–2025 |
| 7 | Inflow and Infiltration Program | Wastewater | Membranes and filtration | $400K | 2024–2028 |
| 8 | Lead and Copper Rule – Service Line Replacement | Water Distribution | Lead service line replacement | $400K | 2024–2028 |
| 9 | Water Main Replacement – Morton Street (Gibbs to Vauconsant) | Water Distribution | Water mains and distribution | $350K | 2024–2025 |
| 10 | Steel Street Water Main Installation – Across from Cemetery | Water Distribution | Water mains and distribution | $300K | 2025–2026 |
17 more line items in St. Johns, with descriptions and contacts
Klarifi holds every St. Johns line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$5M
21 items
2026
$5M
4 items
2027
$4M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 15 | $7M | 53% |
| Water Supply | 4 | $3M | 21% |
| Water Distribution | 8 | $4M | 27% |
No publicly owned treatment plant is recorded under St. Johns in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Michigan.
Sources and methodology
Budgets and years are as published in St. Johns’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2029 (27 line items).
Data refreshed September 11, 2026.