25 line items · $22M · starting 2026–2029 · 1 plan
Nevada's published capital plans list 25 water, sewer and wastewater line items with a combined planning budget of $22M, of which 10 items worth $2M sit in the wastewater and sewer departments. The largest single item is Plant improvements at $18M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Plant improvements | Water Supply | Wastewater treatment plant upgrades | $18M | 2025–2026 |
| 2 | Allgeir/Martin Engineering | Water Supply | — | $1M | 2025–2026 |
| 3 | Camp Clark Sewer | Sewer | Sewer rehabilitation and I&I | $1M | 2025 |
| 4 | Lift Station #2 and basin improvements | Sewer | Lift stations | $500K | 2026 |
| 5 | South Tower interior painting | Water Supply | Buildings, HVAC and site work | $200K | 2025 |
| 6 | Water main improvements | Water Distribution | Water mains and distribution | $200K | 2026–2027 |
| 7 | AMI Water Meter Upgrades | Water Distribution | Meters and AMI | $150K | 2025–2027 |
| 8 | MDNR Compliance | Wastewater | — | $150K | 2025–2027 |
| 9 | Sewer main improvements | Sewer | Sewer rehabilitation and I&I | $150K | 2025 |
| 10 | UV Bulb Replacement | Wastewater | Disinfection and UV | $60K | 2024–2028 |
15 more line items in Nevada, with descriptions and contacts
Klarifi holds every Nevada line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$21M
15 items
2026
$860K
7 items
2027
$20K
1 items
2028
$7K
1 items
2029
$25K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $326K | 2% |
| Sewer | 3 | $2M | 8% |
| Water Supply | 13 | $19M | 89% |
| Water Distribution | 2 | $350K | 2% |
1 publicly owned treatment plant in Nevada with 25 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Nevada WWTF | 0.94 | MO0089109 | 25 |
Sources and methodology
Budgets and years are as published in Nevada’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (25 line items).
Data refreshed September 11, 2026.