13 line items · $9M · starting 2026–2028 · 1 plan
Nixa's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $9M, of which 7 items worth $3M sit in the wastewater and sewer departments. The largest single item is Water Tower #9 at $3M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Water Tower #9 | Water Supply | Storage tanks and reservoirs | $3M | 2025 |
| 2 | Nixa North Loop Water Main | Water Distribution | Water mains and distribution | $1M | 2026 |
| 3 | Sludge Holding Basin | Wastewater | Biosolids, sludge and dewatering | $1M | 2025 |
| 4 | Well 14 | Water Supply | Wells and groundwater | $1M | 2028 |
| 5 | New Vactor Truck | Sewer | Vehicles and equipment | $750K | 2027 |
| 6 | Clarifier Lining | Wastewater | Clarifiers and settling | $700K | 2026 |
| 7 | Compost Facility Expansion | Wastewater | — | $300K | 2025 |
| 8 | New UV System for Nixa WWTF | Wastewater | Disinfection and UV | $300K | 2025 |
| 9 | New Excavator | Water Distribution | Vehicles and equipment | $160K | 2025 |
| 10 | Bioxide Tanks for Lift Station | Sewer | Lift stations | $150K | 2025 |
3 more line items in Nixa, with descriptions and contacts
Klarifi holds every Nixa line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$5M
9 items
2026
$2M
2 items
2027
$750K
1 items
2028
$1M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $2M | 29% |
| Sewer | 2 | $900K | 11% |
| Water Supply | 2 | $4M | 44% |
| Water Distribution | 4 | $1M | 17% |
2 publicly owned treatment plants in Nixa with 30 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Nixa WWTF | 1.52 | MO0028037 | 16 |
| Fremont Hills WWTP | 0.09 | MO0106151 | 14 |
Sources and methodology
Budgets and years are as published in Nixa’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2028 (13 line items).
Data refreshed September 11, 2026.