Nixa, Missouri: water and wastewater capital improvement projects

13 line items · $9M · starting 2026–2028 · 1 plan

Nixa's published capital plans list 13 water, sewer and wastewater line items with a combined planning budget of $9M, of which 7 items worth $3M sit in the wastewater and sewer departments. The largest single item is Water Tower #9 at $3M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Nixa

The 10 largest water, sewer and wastewater line items in Nixa’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Water Tower #9Water SupplyStorage tanks and reservoirs$3M2025
2Nixa North Loop Water MainWater DistributionWater mains and distribution$1M2026
3Sludge Holding BasinWastewaterBiosolids, sludge and dewatering$1M2025
4Well 14Water SupplyWells and groundwater$1M2028
5New Vactor TruckSewerVehicles and equipment$750K2027
6Clarifier LiningWastewaterClarifiers and settling$700K2026
7Compost Facility ExpansionWastewater$300K2025
8New UV System for Nixa WWTFWastewaterDisinfection and UV$300K2025
9New ExcavatorWater DistributionVehicles and equipment$160K2025
10Bioxide Tanks for Lift StationSewerLift stations$150K2025

3 more line items in Nixa, with descriptions and contacts

Klarifi holds every Nixa line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$5M

9 items

2026

$2M

2 items

2027

$750K

1 items

2028

$1M

1 items

By department

Line items and planning budgets by department, Nixa.
DepartmentLine itemsBudgetShare
Wastewater5$2M29%
Sewer2$900K11%
Water Supply2$4M44%
Water Distribution4$1M17%

Project types in Nixa's plan

Wastewater treatment plants in Nixa

2 publicly owned treatment plants in Nixa with 30 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Nixa WWTF1.52MO002803716
Fremont Hills WWTP0.09MO010615114

Other Missouri cities with capital plans

Nixa capital plan questions

Sources and methodology

Budgets and years are as published in Nixa’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2028 (13 line items).

Data refreshed September 11, 2026.