Klarifi Logo
Try for freeLog in
Klarifi Logo

Lebanon, Oregon: water and wastewater capital improvement projects

8 line items · $22M · starting 2026 · 1 plan

Lebanon's published capital plans list 8 water, sewer and wastewater line items with a combined planning budget of $22M, of which 4 items worth $17M sit in the wastewater and sewer departments. The largest single item is WWTP Bio-Solids Improvements at $10M (2024–2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lebanon

The 8 largest water, sewer and wastewater line items in Lebanon’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1WWTP Bio-Solids ImprovementsWastewaterWastewater treatment plant upgrades$10M2024–2025
2WWTP Upgrades via WWTP Master PlanWastewaterWastewater treatment plant upgrades$5M2026–2027
3Priority Waterline ReplacementWater DistributionWater mains and distribution$2M2022–2027
4Hwy 20 Main Replacement (Airport to Division)Water DistributionWater mains and distribution$2M2025–2026
5Sanitary Sewer Replacement ProgramWastewaterSewer rehabilitation and I&I$1M2022–2027
6Downtown Sewer Separation Phase IIIWastewaterSewer rehabilitation and I&I$1M2026–2027
7Grant Street Reservoir UpgradesWater DistributionStorage tanks and reservoirs$850K2026–2027
87th Street Mainline Installation (Kees to Wassom)Water DistributionWater mains and distribution$400K2026–2027

Descriptions, page references and contacts for Lebanon

Klarifi holds every Lebanon line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$15M

4 items

2026

$7M

4 items

By department

Line items and planning budgets by department, Lebanon.
DepartmentLine itemsBudgetShare
Wastewater4$17M78%
Water Distribution4$5M22%

Wastewater treatment plants in Lebanon

1 publicly owned treatment plant in Lebanon with 54 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Lebanon STP1.63OR002081854

Other Oregon cities with capital plans

Lebanon capital plan questions

Sources and methodology

Budgets and years are as published in Lebanon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2022–2027 (8 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free