43 line items · $164M · starting 2026–2029 · 1 plan
Pasadena's published capital plans list 43 water, sewer and wastewater line items with a combined planning budget of $164M, of which 30 items worth $95M sit in the wastewater and sewer departments. The largest single item is Golden Acres WWTP SW Det & Flow Diver at $14M (2025–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Golden Acres WWTP SW Det & Flow Diver | Wastewater | Wastewater treatment plant upgrades | $14M | 2025–2026 |
| 2 | Bay Area Blvd Water Pressure Improv | Water Distribution | Pump stations | $11M | 2027 |
| 3 | Pas Ind Dis 36in Transmission Line Ph II | Water Distribution | Water mains and distribution | $11M | 2028 |
| 4 | Pas Ind Dis 36in Transmission Line Ph I | Water Distribution | Water mains and distribution | $11M | 2027 |
| 5 | CWA Pump Station Rehabilitation | Water Distribution | Pump stations | $9M | 2029 |
| 6 | Pasadena Industrial District 20 in Loop | Water Distribution | Water mains and distribution | $9M | 2025 |
| 7 | Citywide Sanitary Sewer Rehab | Sewer | Sewer rehabilitation and I&I | $9M | 2025 |
| 8 | Citywide Waterline Replacement | Water Distribution | Water mains and distribution | $9M | 2025–2029 |
| 9 | North Main Lift Station | Wastewater | Lift stations | $8M | 2025–2027 |
| 10 | Vince Bayou WWTP Wet Weather Facility | Wastewater | Wastewater treatment plant upgrades | $5M | 2025–2027 |
33 more line items in Pasadena, with descriptions and contacts
Klarifi holds every Pasadena line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$94M
30 items
2026
$13M
4 items
2027
$26M
4 items
2028
$18M
3 items
2029
$12M
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 25 | $81M | 49% |
| Sewer | 5 | $15M | 9% |
| Water Supply | 4 | $4M | 3% |
| Water Distribution | 9 | $64M | 39% |
1 publicly owned treatment plant in Pasadena with 139 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| New Vince Bayou WWTF | 25 | TX0117528 | 139 |
Sources and methodology
Budgets and years are as published in Pasadena’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2029 (43 line items).
Data refreshed September 11, 2026.