29 line items · $6M · starting 2027–2031 · 1 plan
Clintonville's published capital plans list 29 water, sewer and wastewater line items with a combined planning budget of $6M, of which 12 items worth $2M sit in the wastewater and sewer departments. The largest single item is New Well #6 at $2M (2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | New Well #6 | Water Supply | Wells and groundwater | $2M | 2030 |
| 2 | Jet Truck-freightliner | Wastewater | Vehicles and equipment | $700K | 2031 |
| 3 | West (8th to Ruth) | Water Distribution | — | $417K | 2027–2028 |
| 4 | Torrey St (N 12th to N Clinton Ave) | Water Distribution | Water mains and distribution | $325K | 2030–2031 |
| 5 | Torrey St (N 12th to N Clinton Ave) | Sewer | Sewer rehabilitation and I&I | $292K | 2030–2031 |
| 6 | 16th Reconstruction - (Anne to Garfield) | Water Distribution | Water mains and distribution | $262K | 2025 |
| 7 | Meters | Water Distribution | Meters and AMI | $260K | 2025–2032 |
| 8 | S Clinton - (8th to Stewart) | Water Distribution | — | $259K | 2027–2028 |
| 9 | West (8th to Ruth) | Sewer | — | $246K | 2027–2028 |
| 10 | Hydrants | Water Distribution | Water mains and distribution | $240K | 2025–2032 |
19 more line items in Clintonville, with descriptions and contacts
Klarifi holds every Clintonville line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
12 items
2027
$1M
7 items
2029
$63K
2 items
2030
$3M
6 items
2031
$770K
2 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 5 | $853K | 14% |
| Sewer | 7 | $1M | 23% |
| Water Supply | 9 | $2M | 28% |
| Water Distribution | 8 | $2M | 35% |
1 publicly owned treatment plant in Clintonville. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Clintonville Wastewater Treatment Plant | 0.45 | WI0021466 | 0 |
Sources and methodology
Budgets and years are as published in Clintonville’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2032 (29 line items).
Data refreshed September 11, 2026.