Fort Atkinson, Wisconsin: water and wastewater capital improvement projects

19 line items · $4M · 1 plan

Fort Atkinson's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $4M, of which 7 items worth $2M sit in the wastewater and sewer departments. The largest single item is Solar Project at Treatment Facility at $2M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Fort Atkinson

The 10 largest water, sewer and wastewater line items in Fort Atkinson’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Solar Project at Treatment FacilityWastewaterWastewater treatment plant upgrades$2M2025
2Main ReplacementWater DistributionWater mains and distribution$722K2025
3Collection System Maintenance and ImprovementsSewerSewer rehabilitation and I&I$450K2025
4Building #10 Roof ReplacementWastewaterBuildings, HVAC and site work$300K2025
5Hydrants and ServicesWater DistributionWater mains and distribution$235K2025
6Well GeneratorWater SupplyWells and groundwater$185K2025
7Lift Station Pumps and GeneratorsSewerPump stations$150K2025
8Thickened Activated SludgeWastewaterBiosolids, sludge and dewatering$50K2025
95/8" Water MetersWater DistributionMeters and AMI$45K2025
10Banker Road Design & InfrastructureWater DistributionStormwater and flood resilience$45K2025

9 more line items in Fort Atkinson, with descriptions and contacts

Klarifi holds every Fort Atkinson line item with its description, the page it appears on and the source document, plus 3 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$4M

19 items

By department

Line items and planning budgets by department, Fort Atkinson.
DepartmentLine itemsBudgetShare
Wastewater4$2M48%
Sewer3$615K16%
Water Supply3$229K6%
Water Distribution9$1M31%

Project types in Fort Atkinson's plan

Wastewater treatment plants in Fort Atkinson

1 publicly owned treatment plant in Fort Atkinson. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Fort Atkinson Wastewater TreatWI00224890

Other Wisconsin cities with capital plans

Fort Atkinson capital plan questions

Sources and methodology

Budgets and years are as published in Fort Atkinson’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2030 (19 line items).

Data refreshed September 11, 2026.