18 line items · $18M · starting 2026–2030 · 1 plan
Marshfield's published capital plans list 18 water, sewer and wastewater line items with a combined planning budget of $18M, of which 18 items worth $18M sit in the wastewater and sewer departments. The largest single item is North East Force Main New at $9M (2026–2027). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | North East Force Main New | Sewer | Force mains and interceptors | $9M | 2026–2027 |
| 2 | Disinfection Addition | Wastewater | Disinfection and UV | $3M | 2029–2030 |
| 3 | Sanitary Sewer Lining - City Wide | Sewer | Sewer rehabilitation and I&I | $2M | 2026–2030 |
| 4 | Lincoln Lift Station Upgrade Controls/Generator | Sewer | Lift stations | $1M | 2026–2027 |
| 5 | Vine Ave (4th to 14th) Sanitary Reconstruct | Sewer | Sewer rehabilitation and I&I | $630K | 2027 |
| 6 | Cedar Ave (8th to 14th) Sanitary Reconst | Sewer | Sewer rehabilitation and I&I | $385K | 2028 |
| 7 | Cherry Ave (3rd to 9th) Sanitary Reconstruct | Sewer | Sewer rehabilitation and I&I | $385K | 2028 |
| 8 | Wastewater Utility - Vehicles & Equipment | Wastewater | Vehicles and equipment | $283K | 2026–2030 |
| 9 | 5th St (Chestnut to Oak) Sanitary Reconst | Sewer | Sewer rehabilitation and I&I | $281K | 2026 |
| 10 | 4th St (Maple to Peach) Sanitary Reconst | Sewer | Sewer rehabilitation and I&I | $270K | 2028 |
8 more line items in Marshfield, with descriptions and contacts
Klarifi holds every Marshfield line item with its description, the page it appears on and the source document, plus 2 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$12M
8 items
2027
$975K
4 items
2028
$1M
4 items
2029
$3M
1 items
2030
$250K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 3 | $4M | 21% |
| Sewer | 15 | $14M | 79% |
1 publicly owned treatment plant in Marshfield with 4 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Marshfield Wastewater Utility | 2.42 | WI0021024 | 4 |
Sources and methodology
Budgets and years are as published in Marshfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (18 line items).
Data refreshed September 11, 2026.