9 line items · $2M · 1 plan
Port Washington's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $2M, of which 5 items worth $2M sit in the wastewater and sewer departments. The largest single item is Special Main Projects – Spring Street at $1M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Special Main Projects – Spring Street | Sewer | Water mains and distribution | $1M | 2025 |
| 2 | Creek Crossing Protection – Valley Creek | Wastewater | Sewer rehabilitation and I&I | $170K | 2025 |
| 3 | Special Main Projects – Webster spur | Water Distribution | Water mains and distribution | $120K | 2025 |
| 4 | Aerobic Sludge Thickener Refurbishment | Wastewater | Biosolids, sludge and dewatering | $100K | 2025 |
| 5 | Lift Station 3 | Wastewater | Lift stations | $100K | 2025 |
| 6 | Additional Water Utility Truck | Water Distribution | Vehicles and equipment | $90K | 2025 |
| 7 | Additional Equipment - Skid Steer Loader | Water Distribution | Vehicles and equipment | $80K | 2025 |
| 8 | Replace Superintendent Truck | Water Distribution | Vehicles and equipment | $70K | 2025 |
| 9 | Lift Station 2 Programmable Logic Controller (PLC) Upgrade | Wastewater | SCADA, controls and instrumentation | $47K | 2025 |
Descriptions, page references and contacts for Port Washington
Klarifi holds every Port Washington line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$2M
9 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 4 | $417K | 22% |
| Sewer | 1 | $1M | 59% |
| Water Distribution | 4 | $360K | 19% |
1 publicly owned treatment plant in Port Washington with 20 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Port Washington WWTP | 1.04 | WI0020460 | 20 |
Sources and methodology
Budgets and years are as published in Port Washington’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: Adopted Budget 2025 (9 line items).
Data refreshed September 11, 2026.