Port Washington, Wisconsin: water and wastewater capital improvement projects

9 line items · $2M · 1 plan

Port Washington's published capital plans list 9 water, sewer and wastewater line items with a combined planning budget of $2M, of which 5 items worth $2M sit in the wastewater and sewer departments. The largest single item is Special Main Projects – Spring Street at $1M (2025). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Port Washington

The 9 largest water, sewer and wastewater line items in Port Washington’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Special Main Projects – Spring StreetSewerWater mains and distribution$1M2025
2Creek Crossing Protection – Valley CreekWastewaterSewer rehabilitation and I&I$170K2025
3Special Main Projects – Webster spurWater DistributionWater mains and distribution$120K2025
4Aerobic Sludge Thickener RefurbishmentWastewaterBiosolids, sludge and dewatering$100K2025
5Lift Station 3WastewaterLift stations$100K2025
6Additional Water Utility TruckWater DistributionVehicles and equipment$90K2025
7Additional Equipment - Skid Steer LoaderWater DistributionVehicles and equipment$80K2025
8Replace Superintendent TruckWater DistributionVehicles and equipment$70K2025
9Lift Station 2 Programmable Logic Controller (PLC) UpgradeWastewaterSCADA, controls and instrumentation$47K2025

Descriptions, page references and contacts for Port Washington

Klarifi holds every Port Washington line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$2M

9 items

By department

Line items and planning budgets by department, Port Washington.
DepartmentLine itemsBudgetShare
Wastewater4$417K22%
Sewer1$1M59%
Water Distribution4$360K19%

Wastewater treatment plants in Port Washington

1 publicly owned treatment plant in Port Washington with 20 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Port Washington WWTP1.04WI002046020

Other Wisconsin cities with capital plans

Port Washington capital plan questions

Sources and methodology

Budgets and years are as published in Port Washington’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: Adopted Budget 2025 (9 line items).

Data refreshed September 11, 2026.