North Miami Beach, Florida: water and wastewater capital improvement projects

12 line items · $95M · 1 plan

North Miami Beach's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $95M, of which 7 items worth $12M sit in the wastewater and sewer departments. The largest single item is Norwood WTP Improvements Phase 2 at $45M (2020–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in North Miami Beach

The 10 largest water, sewer and wastewater line items in North Miami Beach’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Norwood WTP Improvements Phase 2Water SupplyWater treatment plants$45M2020–2026
2Eastern Shores Watermain System RehabilitationWater SupplyWater mains and distribution$19M2020–2025
3System-wide Watermains Replacement ProgramWater SupplyWater mains and distribution$16M2020–2027
4Corona del Mar Collection System - Phase 2SewerSewer rehabilitation and I&I$4M2020–2026
5Master PS #4 Force Main Re-routingSewerPump stations$3M2020–2026
6Operations Center Pump Station ImprovementsWater SupplyPump stations$2M2021–2026
7Bell Gardens Force Main ReplacementSewerForce mains and interceptors$2M2020–2026
8NE 19th Ave SewerSewerSewer rehabilitation and I&I$2M2022–2026
9Implement Wastewater Collection System Plan of ComplianceSewerSewer rehabilitation and I&I$490K2021–2025
10Cravero Force Main ReplacementSewerForce mains and interceptors$486K2020–2025

2 more line items in North Miami Beach, with descriptions and contacts

Klarifi holds every North Miami Beach line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$95M

12 items

By department

Line items and planning budgets by department, North Miami Beach.
DepartmentLine itemsBudgetShare
Sewer7$12M13%
Water Supply5$83M87%

Wastewater treatment plants in North Miami Beach

No publicly owned treatment plant is recorded under North Miami Beach in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Florida.

Other Florida cities with capital plans

North Miami Beach capital plan questions

Sources and methodology

Budgets and years are as published in North Miami Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2024–2026 (12 line items).