12 line items · $95M · 1 plan
North Miami Beach's published capital plans list 12 water, sewer and wastewater line items with a combined planning budget of $95M, of which 7 items worth $12M sit in the wastewater and sewer departments. The largest single item is Norwood WTP Improvements Phase 2 at $45M (2020–2026). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Norwood WTP Improvements Phase 2 | Water Supply | Water treatment plants | $45M | 2020–2026 |
| 2 | Eastern Shores Watermain System Rehabilitation | Water Supply | Water mains and distribution | $19M | 2020–2025 |
| 3 | System-wide Watermains Replacement Program | Water Supply | Water mains and distribution | $16M | 2020–2027 |
| 4 | Corona del Mar Collection System - Phase 2 | Sewer | Sewer rehabilitation and I&I | $4M | 2020–2026 |
| 5 | Master PS #4 Force Main Re-routing | Sewer | Pump stations | $3M | 2020–2026 |
| 6 | Operations Center Pump Station Improvements | Water Supply | Pump stations | $2M | 2021–2026 |
| 7 | Bell Gardens Force Main Replacement | Sewer | Force mains and interceptors | $2M | 2020–2026 |
| 8 | NE 19th Ave Sewer | Sewer | Sewer rehabilitation and I&I | $2M | 2022–2026 |
| 9 | Implement Wastewater Collection System Plan of Compliance | Sewer | Sewer rehabilitation and I&I | $490K | 2021–2025 |
| 10 | Cravero Force Main Replacement | Sewer | Force mains and interceptors | $486K | 2020–2025 |
2 more line items in North Miami Beach, with descriptions and contacts
Klarifi holds every North Miami Beach line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
Before 2026
$95M
12 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Sewer | 7 | $12M | 13% |
| Water Supply | 5 | $83M | 87% |
No publicly owned treatment plant is recorded under North Miami Beach in the facility directory; the city may be served by a regional plant listed under another municipality. Browse all plants in Florida.
Sources and methodology
Budgets and years are as published in North Miami Beach’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2024–2026 (12 line items).
Data refreshed September 11, 2026.