19 line items · $19M · starting 2026–2029 · 1 plan
Pittsfield's published capital plans list 19 water, sewer and wastewater line items with a combined planning budget of $19M, of which 11 items worth $17M sit in the wastewater and sewer departments. The largest single item is WWTP Raw Sewage Pump Replacement at $4M (2028). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | WWTP Raw Sewage Pump Replacement | Wastewater | Pump stations | $4M | 2028 |
| 2 | CHP - Supplemental | Wastewater | Anaerobic digesters and biogas | $3M | 2026 |
| 3 | WWTP Switchgear | Wastewater | Wastewater treatment plant upgrades | $3M | 2026 |
| 4 | WWTP Road Repairs | Wastewater | Wastewater treatment plant upgrades | $2M | 2027 |
| 5 | WWTP Aeration Automated Valves (EPA Grant) | Wastewater | Aeration and blowers | $2M | 2026 |
| 6 | WWTP Roof Replacements | Wastewater | Wastewater treatment plant upgrades | $900K | 2028 |
| 7 | WWTP WAS Pump Replacement | Wastewater | Pump stations | $800K | 2028 |
| 8 | WWTP Digester Recirculation Pump Replacement | Wastewater | Anaerobic digesters and biogas | $700K | 2029 |
| 9 | Jet rodder DPU Water | Water Supply | Vehicles and equipment | $400K | 2027 |
| 10 | 1 Ton Pickup Truck DPU Waste Water | Wastewater | Vehicles and equipment | $375K | 2026–2030 |
9 more line items in Pittsfield, with descriptions and contacts
Klarifi holds every Pittsfield line item with its description, the page it appears on and the source document, plus 5 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$9M
10 items
2027
$3M
5 items
2028
$6M
3 items
2029
$700K
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 11 | $17M | 92% |
| Water Supply | 8 | $2M | 8% |
1 publicly owned treatment plant in Pittsfield with 84 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Pittsfield Wastewater Treatment Facility | 7 | MA0101681 | 84 |
Sources and methodology
Budgets and years are as published in Pittsfield’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2025–2030 (19 line items).
Data refreshed September 11, 2026.