56 line items · $10M · starting 2026–2030 · 1 plan
Lebanon's published capital plans list 56 water, sewer and wastewater line items with a combined planning budget of $10M, of which 28 items worth $7M sit in the wastewater and sewer departments. The largest single item is Collection Improvements- Goodwin Hollow at $4M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | Collection Improvements- Goodwin Hollow | Sewer | Sewer rehabilitation and I&I | $4M | 2026–2030 |
| 2 | Combination Cleaning Truck | Sewer | Vehicles and equipment | $800K | 2028 |
| 3 | Wastewater Equipment Repairs | Wastewater | Vehicles and equipment | $625K | 2026–2030 |
| 4 | Evergreen Parkway | Water Distribution | Water mains and distribution | $425K | 2028 |
| 5 | CCTV Van | Sewer | Sewer rehabilitation and I&I | $400K | 2029 |
| 6 | Hwy 5 Rosenthal to Woodhill water tie line | Water Distribution | Water mains and distribution | $200K | 2030 |
| 7 | Misc Sewer Extensions | Sewer | Sewer rehabilitation and I&I | $200K | 2026–2030 |
| 8 | Trunk Sewer Replacement South 5 to Evergreen | Sewer | Force mains and interceptors | $180K | 2029 |
| 9 | UV System Parts | Wastewater | Disinfection and UV | $175K | 2026–2030 |
| 10 | Replace Variable Frequency Drives (VFD) | Wastewater | Generators, power and electrical | $150K | 2026–2028 |
46 more line items in Lebanon, with descriptions and contacts
Klarifi holds every Lebanon line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$6M
24 items
2027
$491K
11 items
2028
$1M
4 items
2029
$1M
10 items
2030
$706K
7 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 12 | $1M | 14% |
| Sewer | 16 | $6M | 60% |
| Water Supply | 6 | $479K | 5% |
| Water Distribution | 22 | $2M | 21% |
2 publicly owned treatment plants in Lebanon with 48 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Lebanon WWTP | 2.22 | MO0089010 | 1 |
| Laclede County Pwsd 3 | 0.03 | MO0130427 | 47 |
Sources and methodology
Budgets and years are as published in Lebanon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (56 line items).