Klarifi Logo
Try for freeLog in
Klarifi Logo

Lebanon, Missouri: water and wastewater capital improvement projects

56 line items · $10M · starting 2026–2030 · 1 plan

Lebanon's published capital plans list 56 water, sewer and wastewater line items with a combined planning budget of $10M, of which 28 items worth $7M sit in the wastewater and sewer departments. The largest single item is Collection Improvements- Goodwin Hollow at $4M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Lebanon

The 10 largest water, sewer and wastewater line items in Lebanon’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1Collection Improvements- Goodwin HollowSewerSewer rehabilitation and I&I$4M2026–2030
2Combination Cleaning TruckSewerVehicles and equipment$800K2028
3Wastewater Equipment RepairsWastewaterVehicles and equipment$625K2026–2030
4Evergreen ParkwayWater DistributionWater mains and distribution$425K2028
5CCTV VanSewerSewer rehabilitation and I&I$400K2029
6Hwy 5 Rosenthal to Woodhill water tie lineWater DistributionWater mains and distribution$200K2030
7Misc Sewer ExtensionsSewerSewer rehabilitation and I&I$200K2026–2030
8Trunk Sewer Replacement South 5 to EvergreenSewerForce mains and interceptors$180K2029
9UV System PartsWastewaterDisinfection and UV$175K2026–2030
10Replace Variable Frequency Drives (VFD)WastewaterGenerators, power and electrical$150K2026–2028

46 more line items in Lebanon, with descriptions and contacts

Klarifi holds every Lebanon line item with its description, the page it appears on and the source document. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$6M

24 items

2027

$491K

11 items

2028

$1M

4 items

2029

$1M

10 items

2030

$706K

7 items

By department

Line items and planning budgets by department, Lebanon.
DepartmentLine itemsBudgetShare
Wastewater12$1M14%
Sewer16$6M60%
Water Supply6$479K5%
Water Distribution22$2M21%

Project types in Lebanon's plan

Wastewater treatment plants in Lebanon

2 publicly owned treatment plants in Lebanon with 48 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Lebanon WWTP2.22MO00890101
Laclede County Pwsd 30.03MO013042747

Other Missouri cities with capital plans

Lebanon capital plan questions

Sources and methodology

Budgets and years are as published in Lebanon’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (56 line items).

Data refreshed September 11, 2026.

Try Klarifi for free

Create your own trial account and explore how Klarifi can help you.

Try for free