Albany, Oregon: water and wastewater capital improvement projects

23 line items · $44M · starting 2026–2030 · 1 plan

Albany's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $44M, of which 7 items worth $28M sit in the wastewater and sewer departments. The largest single item is 2026 Collection System Rehabilitation Projects at $6M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Albany

The 10 largest water, sewer and wastewater line items in Albany’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
12026 Collection System Rehabilitation ProjectsWastewaterSewer rehabilitation and I&I$6M2026–2030
2Cox Creek Interceptor Project Phase 4WastewaterForce mains and interceptors$6M2026
3AM-WRF Disinfection StudyWastewaterDisinfection and UV$5M2026–2028
4Century Drive Lift Station EvaluationWastewaterLift stations$5M2026–2030
5North Albany Pump StationWater SupplyPump stations$5M2027
6Ferry Street Interceptor ProjectWastewaterForce mains and interceptors$4M2026
7AMR Infrastructure ProjectWater SupplyMeters and AMI$3M2026–2029
8Large Filter Media ReplacementWater SupplyMembranes and filtration$2M2029
92026 Lateral Replacement & Basement ProtectionWastewaterSewer rehabilitation and I&I$2M2026–2030
103rd Avenue and Montgomery Steet Water LineWater DistributionWater mains and distribution$1M2027

13 more line items in Albany, with descriptions and contacts

Klarifi holds every Albany line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

2026

$33M

15 items

2027

$6M

4 items

2028

$2M

2 items

2029

$2M

1 items

2030

$1M

1 items

By department

Line items and planning budgets by department, Albany.
DepartmentLine itemsBudgetShare
Wastewater7$28M63%
Water Supply11$12M28%
Water Distribution5$4M9%

Wastewater treatment plants in Albany

1 publicly owned treatment plant in Albany with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Albany-Millersburg WRF4.59OR00288012

Other Oregon cities with capital plans

Albany capital plan questions

Sources and methodology

Budgets and years are as published in Albany’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2026–2030 (23 line items).