23 line items · $44M · starting 2026–2030 · 1 plan
Albany's published capital plans list 23 water, sewer and wastewater line items with a combined planning budget of $44M, of which 7 items worth $28M sit in the wastewater and sewer departments. The largest single item is 2026 Collection System Rehabilitation Projects at $6M (2026–2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.
A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.
| # | Project | Department | Type | Budget | Years |
|---|---|---|---|---|---|
| 1 | 2026 Collection System Rehabilitation Projects | Wastewater | Sewer rehabilitation and I&I | $6M | 2026–2030 |
| 2 | Cox Creek Interceptor Project Phase 4 | Wastewater | Force mains and interceptors | $6M | 2026 |
| 3 | AM-WRF Disinfection Study | Wastewater | Disinfection and UV | $5M | 2026–2028 |
| 4 | Century Drive Lift Station Evaluation | Wastewater | Lift stations | $5M | 2026–2030 |
| 5 | North Albany Pump Station | Water Supply | Pump stations | $5M | 2027 |
| 6 | Ferry Street Interceptor Project | Wastewater | Force mains and interceptors | $4M | 2026 |
| 7 | AMR Infrastructure Project | Water Supply | Meters and AMI | $3M | 2026–2029 |
| 8 | Large Filter Media Replacement | Water Supply | Membranes and filtration | $2M | 2029 |
| 9 | 2026 Lateral Replacement & Basement Protection | Wastewater | Sewer rehabilitation and I&I | $2M | 2026–2030 |
| 10 | 3rd Avenue and Montgomery Steet Water Line | Water Distribution | Water mains and distribution | $1M | 2027 |
13 more line items in Albany, with descriptions and contacts
Klarifi holds every Albany line item with its description, the page it appears on and the source document, plus 4 verified contacts at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.
2026
$33M
15 items
2027
$6M
4 items
2028
$2M
2 items
2029
$2M
1 items
2030
$1M
1 items
| Department | Line items | Budget | Share |
|---|---|---|---|
| Wastewater | 7 | $28M | 63% |
| Water Supply | 11 | $12M | 28% |
| Water Distribution | 5 | $4M | 9% |
1 publicly owned treatment plant in Albany with 2 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.
| Plant | Avg flow (MGD) | NPDES | Violations (3y) |
|---|---|---|---|
| Albany-Millersburg WRF | 4.59 | OR0028801 | 2 |
Sources and methodology
Budgets and years are as published in Albany’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.
Documents: CIP 2026–2030 (23 line items).
Data refreshed September 11, 2026.