28 line items · $30M · starting 2026–2031 · 1 plan

Coburg's published capital plans list 28 water, sewer and wastewater line items with a combined planning budget of $30M, of which 10 items worth $4M sit in the wastewater and sewer departments. The largest single item is EWEB Waterline Connection – 8–12" Waterline for Water Supply at $9M (2030). The ten largest items are listed below; the full list with descriptions and page references is in Klarifi.

A capital improvement plan (CIP) is a city’s multi-year budget for building and replacing infrastructure. The water, sewer and wastewater sections list each project with its budget and the years it is funded, which makes them the earliest public signal that a plant, pump station or pipe network is about to be upgraded, usually two to four years before a contract is awarded.

The largest water and sewer projects in Coburg

The 10 largest water, sewer and wastewater line items in Coburg’s capital plans by planning budget.
#ProjectDepartmentTypeBudgetYears
1EWEB Waterline Connection – 8–12" Waterline for Water SupplyWater SupplyWater mains and distribution$9M2030
2New Water Reservoir – 750,000 Gallon Elevated ReservoirWater SupplyStorage tanks and reservoirs$7M2030
3Existing Water Storage Tanks Rehab – Replace/Retrofit (Seismic) Existing (2) 500k/GL TanksWater DistributionStorage tanks and reservoirs$3M2028–2029
4I-5 Transmission Line (New) – East/West Transmission Loop Line – North of Exit 199Water SupplyWater mains and distribution$3M2030
5Renewable Energy (Solar) System – Solar Panel Installation at WWTP (Est. 199 kW)WastewaterWastewater treatment plant upgrades$1M2026–2027
6Waterline Pipeline Replacements – 6 Inch Pipeline Replacements in Various LocationsWater DistributionWater mains and distribution$1M2030
7WW Treatment Plant – Facilities Improvements – Additional Treatment BasinWastewater$900K2031
8Pioneer Valley Estates Distribution System – Replacement of Existing Distribution SystemWater DistributionWater mains and distribution$750K2026–2027
9E Dixon St Waterline Replacement – Diamond St to East End – Waterline ReplacementWater DistributionWater mains and distribution$650K2027–2028
10WW Treatment Plant – Facilities Improvements – Additional Membrane(s)WastewaterMembranes and filtration$600K2031

18 more line items in Coburg, with descriptions and contacts

Klarifi holds every Coburg line item with its description, the page it appears on and the source document, plus 1 verified contact at the city’s treatment plants. Track new plans as they are adopted and compare with similar projects in other cities.

Start a free trial

Planned spend by start year

Before 2026

$960K

3 items

2026

$3M

8 items

2027

$1M

3 items

2028

$3M

2 items

2030

$20M

6 items

2031

$2M

6 items

By department

Line items and planning budgets by department, Coburg.
DepartmentLine itemsBudgetShare
Wastewater10$4M13%
Water Supply8$20M66%
Water Distribution10$6M21%

Project types in Coburg's plan

Wastewater treatment plants in Coburg

1 publicly owned treatment plant in Coburg with 23 permit violations in the last three years. Each profile shows flow, permit, technology and compliance data.

PlantAvg flow (MGD)NPDESViolations (3y)
Coburg STP0.15OR004462823

Other Oregon cities with capital plans

Coburg capital plan questions

Sources and methodology

Budgets and years are as published in Coburg’s capital improvement plan or adopted budget. Klarifi extracts the water, sewer and wastewater line items from the published document, keeps the page reference for each one, and assigns a project type from the title and description with a keyword classifier. Figures are planning budgets, not awarded contracts, and can change when a plan is re-adopted.

Documents: CIP 2025–2031 (28 line items).